Skip to main content
Home Case Study: Patcham Infant School
Image Full

Patcham Infant School

Image FullImage FullImage Full

Patcham Infant School

NBB School Shelters were contacted by Patcham Infant School to provide an estimate for two shelters and fencing. The first shelter was to provide cover to the nursery door, and second was a shelter and fence to the main entrance of the school. 

They currently had a timber structure in place at the nursery class and were looking for something more hardwearing, we recommended a bespoke wall attached Winterbourne structure. The main entrance shelter would also be wall attached in design and we also advised that 100% recycled plastic fencing would be most suitable. 

The shelters were galvanised and powder coated in Blue RAL5002, the surface treatment means that they will last for 25 years life maintained. The school also opted for the 100% recycled plastic fencing, the properties of which mean that it will not require annual upkeep such as sanding, staining or painting and is guaranteed for the same length or time as the shelters (25 years). 

The finished installation has created a functional cover for the nursery protecting staff, pupils and visitors from adverse weather. The entrance shelter provides a lovely welcome area which will last for many years.

Or Call 0800 1777 052 for more information

Image Full

CAD DRAWINGS
available on request

Image Full

INSTALLATION
available for shelters

Image Full

PLANNING PERMISSION
assistance

Image Full

MANUFACTURED
in the UK